Various undertakings and services to the boiler.
Installation of boiler reinforcements and BWE system walkways.
Assembly of piping supplied by BWE, including components and connection to the existing boiler.
Dismantlement of 2 existing I.D. FANS, pre-assembly and installation of 2 new I.D. FANS, connection with new motors and relative auxiliary services/machinery.
Modification of existing GGH system, removal of parts needing replacement, installation of reinforcements, installment of new components and soot blowers, including relative piping.
Installment of boiler internal turbulators.
Assembly of 2 couplings for duct 2 and GGH. Assembly of 2 couplings for duct 3 and 1.
Installation of compressors covering, positioning of FRP tank. Assembly of cooling piping from BWE pumps to tank. Installation of 1 walkway from DeNOx to electro filter, installation of escape routes from +0.00 to +31.500 on the east side of the DeNOx structure.
Demolition of a section of existing piping and supports for the installation of the new BWE line at +40.498 meters height.
Installation of stairs and walkways of the NH3 storage area.
Materials supply, prefabrication and installation of supports in the NH3 storage areas and DeNOx SCR areas.
Prefabrication and installation of piping in the storage areas NH3 and DeNOx SCR, assembly of valves and line components.
Installation of pipe-rack from NH3 storage area to DeNOx area.
Installation of pumps structure supplied by BWE.
Project implemented on behalf of TERMOKIMIK COPORATION ESTABLECIMIENTO PERMANENTE EN ESPANA at the VIESGO Thermal Power Plant in Los Barrios (CADIZ) – Spain